PLC / DCS, modernised.

Siemens, Allen-Bradley, Schneider, ABB — code-level migration, simulation-first rollout, signed firmware, zero unplanned downtime. Brownfield modernised without brownfield surprises.

0
Unplanned downtime
Audit
62443
Re-usable
Code quality
12 wks
Per line
Trusted by enterprises
Aaj Tak
Times of India
BJP
Beyond Reach Premiere League
Red Fm
Wellness Fuel
Junior Cricket Championship
ON Energy
ORYZO AI
Nursing Sarathi
Baatshala Ai
The Traffic People
Aaj Tak
Times of India
BJP
Beyond Reach Premiere League
Red Fm
Wellness Fuel
Junior Cricket Championship
ON Energy
ORYZO AI
Nursing Sarathi
Baatshala Ai
The Traffic People
Aaj Tak
Times of India
BJP
Beyond Reach Premiere League
Red Fm
Wellness Fuel
Junior Cricket Championship
ON Energy
ORYZO AI
Nursing Sarathi
Baatshala Ai
The Traffic People
Service overview

Engineering plc / dcs control systems

PLC / DCS modernisation — code-level migration, simulation-first rollout, parallel runs, signed firmware, zero unplanned downtime. Siemens S7 / TIA, Allen-Bradley Logix, Schneider Modicon, ABB 800xA. Brownfield modernised without brownfield surprises.

Industrial control engineers + software engineers, on the same backlog. That's an unusual combination; we've found it's the only one that survives a plant audit.

Practice signalsSenior-ledWeekly demosCode review on every PRProduction on-call
01
0
Unplanned downtime
Across 12 migrations
02
Audit
62443
Zoning + signed firmware
03
Re-usable
Code quality
v. legacy ladders
04
12 wks
Per line
Pilot to cutover
Business challenges we solve

What keeps teams shipping plc / dcs control systems.

PLC programs from 2008 still in production

Brownfield migration downtime creeping up

Shadow logic in spreadsheets and tribal knowledge

Cybersecurity gaps exposed at recent audit

TI Portal / Studio 5000 upgrades failed because no simulation

Plant operators confused by new screens

Why choose this service

Three senior-led practice lines.

Outcome-anchored, owned by a practice lead with clear accountability, weekly demos, and the kind of code review culture you'd build internally if you had a year.

01

Simulation-first

PLCSIM advanced + Factory IO + twin before cutover.

02

Zero unplanned downtime

Parallel runs, rollback, signed firmware.

03

Industrial + software

Same backlog — no vendor ping-pong.

Key features

What ships, by default in every engagement.

F·01

Code-level migration

Ladder / SCL / ST / FBD, modernised line by line.

F·02

Simulation twin

PLCSIM, Factory IO, twin before cutover.

F·03

Parallel run

Old + new side-by-side before cutover.

F·04

Cybersecurity

ISA/IEC 62443 zoning, signed firmware, audit-ready.

F·05

Operator HMI

Modern, role-aware, alarm-aware.

F·06

On-call

Plant-aware on-call, MTBF plan.

Benefits & business outcomes

Numbers senior clients measure.

Unplanned downtime

During rollout

0
Outcome · 01

Cybersecurity

ISA/IEC 62443 zoning

Audit-ready
Outcome · 02

Code quality

Modernised vs legacy

Re-usable
Outcome · 03
Development process

Senior squads. Tight loops. Code every day.

01
Week 1–2

Floor audit

Asset inventory, control hierarchy, cyber posture.

02
Week 3–4

Migration plan

Code-level migration, simulation, parallel run.

03
Week 5–16

Pilot + scale

Single line pilot, line-by-line rollout.

04
Ongoing

Operate

On-call, monthly tuning, roadmap.

Technologies we use

The stack we ship in production.

Layer · 01

PLC

Siemens
Allen-Bradley
Schneider
ABB
Layer · 02

HMI

WinCC
FactoryTalk
Ignition
Layer · 03

Cyber

ISA/IEC 62443
Signed firmware
DMZ
Industries we serve

Verticals where we've shipped, not where we dabble.

V·01

Discrete

Assembly, test, packaging

Signal0 Unplanned downtime
V·02

Process

Batch, continuous, safety

SignalAudit 62443
V·03

Power

Generation, T&D, substation

SignalRe-usable Code quality
V·04

Water

Treatment, distribution

Signal12 wks Per line
V·05

Pharma

GxP, batch records, eBR

Signal0 Unplanned downtime
V·06

Chemicals

Continuous, batch, safety

SignalAudit 62443
Why Abstriq

Built for teams who ship fast in production.

We're not a body shop or a freelance marketplace. We run a senior-heavy engineering org with clear practice leads, real code review, and real on-call coverage.

Signal
0
Unplanned downtime
Signal
Audit
62443
Signal
Re-usable
Code quality
Signal
12 wks
Per line
Pillar · 01

Vertical AI, not just LLMs

We build agents that actually move numbers — wired into your systems, your data, your workflows.

Pillar · 02

Ship in weeks, not quarters

Small senior squads, tight feedback loops, code-merge every day, demo every week.

Pillar · 03

Industrial-grade rigor

From PLCs to SOC2 — production safety, observability, and resilience baked in.

Pillar · 04

One team across four worlds

Web, mobile, AI, and industrial under one roof — no vendor ping-pong.

FAQs

The questions we hear most.

If yours isn't here — ping us and we'll reply with specifics on your stack.

01Siemens / AB / Schneider / ABB — which?
We work across all four. Migration plan tailored to vendor and your team. We don't sell vendor lock-in.
02Cyber posture?
ISA/IEC 62443 zoning, signed firmware, restricted DMZ, audit-ready architecture and documentation.
03Migration risk?
Simulation-first, parallel runs, rollback rehearsal before cutover. Zero unplanned downtime across last 12 migrations.
04HMI modernisation?
Modern, role-aware, alarm-aware HMIs with operator-friendly UX. We don't ship screens that confuse operators.
Free consultation

Ready to ship plc / dcs control systems?

Tell us the problem — proposal in under 48 hours. NDA-friendly by default, senior-led, and we typically walk you through a proof-of-concept before the engagement closes.

Reply in 24hNDA-friendlySenior-ledProduction on-call

By submitting, you agree we may store this inquiry to reply. NDA-friendly by default.